Bay Marine-
Sparrows Point Md.
 |
Permit Acquisition: Federal, State & Local |
 |
Removed existing piers and docks |
 |
Designed, Constructed & Installed floating dock system & associated
piling |
 |
Installed Bulk Heading: Including vertical timber & stone
revetment |
 |
Removed & Replaced mobile hoist piers for new 60 ton mobile boat
lifting apparatus |
Porters Marina – Seneca Creek, Middle River, Md
 |
Permit Acquisition: Federal, State and Local |
 |
Installed vertical timber bulk heading |
 |
Removal of existing fixed dock & replaced with floating
dock & associated piling |
Goose Harbor Marina – Seneca Creek, Middle River,
Md
 |
Permit Acquisition: Federal, State and Local |
 |
Installed vertical timber bulk head & pile driven pier with Concrete
Boat Ramp |
Harbor Nest – Curtis Bay, Md
 |
Installed 265’ of vertical timber bulk head for bulk unloading
facility |
 |
Designed, Constructed and Installed floating dock system and associated
piling |
 |
Installed Segmented concrete boat ramp for vessel launching & retrieval
by trailer |